Every stage we can fly again is launch capacity we can put back to work. That’s what we’re building toward with Razor Crest Mk-1. Follow the milestones from engine firings and full stage tests at The Anchorage to our first demonstration flight and more.

upper stage technology Validation

Technology Validated

Validation of upper stage technology at Beyond Gravity Launchpad Program

Test
Facilities

Pre-Seed Round

$ 341,586

Injector Validation

Validating injector performance before ignition. Our cold flow test campaigns measure spray pattern, pressure stability, and propellant distribution—qualifying injectors for reliable combustion at scale.

Test Campus Expansion

A 16-acre campus locked in to accelerate facility buildout, multi-engine testing capacity, and large-scale propulsion system qualification for future space launch demands.

Global
Momentum

Pre-Seed Round

$ 4,601,573

Propulsion Reimagined

India’s 1st reusable rocket engine manufactured.

Launch Commitments Secured

Signed launch MoUs valued at $130 million, reflecting strong market confidence and future launch demand.

Global Partnership

Selected as part of the India - US Space and Defense collaboration program

Stage
Validation

Series A :

$ 15 M

Hot Fire Validation

A full-duration hot fire validated the Stallion 1.2 MN booster engine’s thrust, stability, and performance—bringing large-scale propulsion one step closer to flight.

Flight Qualification — Upper Stage

The final step before flight, where upper-stage systems are tested, proven, and cleared for orbital operations.

Orbit
Achieved

Commercial Launch

Commercial Private Orbital Launch, Razor Crest TDV.

APRIL 2023

APRIL 2023

APRIL 2023

APRIL 2023

APRIL 2023

2026

Pegasus Engine Firing

BASE 002 Erection and Commissioning

BASE 001 Fully Operational

TDV Booster Stage Firing Completed

Stage 1 Wind Tunnel Testing (Ascent & Descent)

Stage 2 Wind Tunnel Testing (Ascent & Descent)

2027

TDV Integrated Vehicle Assembly

Full Stage Qualification Campaign Initiated

Landing Leg Deployment Qualification

First TDV Flight Test

RCM1 Booster Stage Flight Qualification

2028

RCM1 Wind Tunnel Testing

RCM1 Assembly and Integration

TDV to RCM1 Data Configuration

First Commercial Launch

2030

Nuclear Fusion and based

2026

2027

2028

2030

2026

2027

2028

2030

Pegasus Engine Firing
Anchorage Erection and Commissioning
Anchorage Fully Operational
TDV Booster Stage Firing Completed
Stage 1 Wind Tunnel Testing (Ascent & Descent)
Stage 2 Wind Tunnel Testing (Ascent & Descent)
Stallion Booster Engine Hot-Fire
TDV Booster Stage Hot-Fire
TDV Upper Stage Hot-Fire
TDV Integrated Vehicle Assembly
Start of Full Stage Qualification Campaign
Landing Leg Deployment Qualification
First TDV Flight Test (Q4 Target)
RCM1 Booster Stage Flight Qualification
RCM1 Wind Tunnel Testing
RCM1 Assembly and Integration
TDV to RCM1 Data Configuration
First Commercial Launch
Nuclear Fusion and based

For Those Ready to Raise the Bar

We are assembling a team driven by mastery and purpose—engineers who challenge limits, elevate standards, and leave their mark on the future of space access.