WHO WE BUILD FOR


Launch Manifest
Q4 2027
Technical demonstration
vehicle (TDV) launch
Q4 2028
First Commercial
Launch
2029
4-6 Additional
Flights


Up to 16 orbit insertions using the upper stage enable multi-customer and multi-payload missions in a single launch, reducing reliance on third parties for last-mile delivery.

With full vehicle recovery, launch operations are driven by refurbishment and replacement timelines rather than long manufacturing lead times—eliminating the need for capital-intensive mass production facilities.

A launch cost range that is not only economically viable but also ensures profitable missions—even when the vehicle is not fully loaded.
Dedicated launch
A flight planned around your primary spacecraft or constellation deployment. We work with you to define the target orbit, launch window and deployment sequence
Rideshare
Share a flight with other spacecraft. We assess whether the planned orbit, schedule and payload interfaces fit your mission.

Building space systems for real-world impact
A new frontier in Space Logistics being developed by The Guild is point-to-point rocket cargo delivery. Rocket based point to point cargo would significantly advance logistics reducing delivery time of important cargo from hours or days to minutes with the ability to be inconspicuous, avoiding radar and defense networks of other nations with swift and precise delivery of cargo.
The Guild's Razor Crest MK-1 is well equipped and an invaluable asset for fulfilling the immediate demands that arise in unforeseen emergencies and hostile situations through point-to-point cargo delivery.

SIGN UP FOR UPDATES
